
1. Code an nested IF statement that causes control to be passed to B-200-FIX-IT if the numeric field, AC-ERROR-COUNT, is less than 100; control to be passed to B-210-FORGET-IT if AC-ERROR-COUNT is greater than 120; and control to be passed to B-220-PATCH-IT otherwise.
2. Code a COMPUTE statement that adds the value of IR-COST to IR-YTD-COST and then divides the result by AC-TOTAL-MONTHS. The final answer should be rounded and placed in the field DL-AVERAGE-COST.
Gracias; [email protected]
